SCDEC1.jpg (64445 bytes) The ceiling demo work is completed.
SCDEC2.jpg (69190 bytes) Scaffolding has been set up to begin construction at the ceiling.
SCDEC3.jpg (65129 bytes) Metal furring strips are being installed on the walls at the upper level.   Drywall will then be installed over these furring strips.
SCDEC4.jpg (72185 bytes) The ductwork for the heating and cooling system is being installed.