The ceiling demo work is completed. |
![]() |
Scaffolding has been set up to begin construction at the ceiling. |
![]() |
Metal furring strips are being installed on the walls at the upper level. Drywall will then be installed over these furring strips. |
![]() |
The ductwork for the heating and cooling system is being installed. |