SCFEB1.jpg (54854 bytes) The new auditorium ceiling is being completed.
SCFEB2.jpg (62718 bytes) Now that the ceiling work is done,  workers are beginning to layout the floor structure.  The floor and steps will be modified so they are not so steep.
SCFEB3.jpg (64521 bytes) The new floor structure will be constructed on top of the existing concrete floor.   Originally the concrete floor was going to be removed and a new concrete floor poured.  This option is much more cost effective than removing the existing floor.
SCFEB4.jpg (67826 bytes) A view looking down to the front of the room.