Drywall work on the ceiling above the stage area is underway. |
 |
Drywall and soffit construction at the back of the auditorium is also
being worked on. |
 |
A view of the 2nd floor lobby of the auditorium. You will notice
the old asbestos ceiling has been completely removed. |
 |
Due to the extensive work being done in the auditorium, it was
decided to replace the worn out roof. |
 |
This handy machine makes removal of the old roof system a snap.
This machine has a blade that slips under the roof while vibrating to loosen
the roofing material. |
 |
The old roof material is being craned down to a dumpster for disposal. |
 |
The roof is then cleaned down to the metal roof deck in preparation for
the new roof system. |