SCJUN2.jpg (71208 bytes) Although fairly minor changes were done to the second floor lobby the appearance has improved dramatically.
SCJUN3.jpg (66004 bytes) Illinois Hall is now substantially complete.  A good cleaning and some minor items are all that remain for 100% completion.
SCJUN4.jpg (72131 bytes) The auditorium is equipped with state of the art audiovisual capabilities.
SCJUN5.jpg (53654 bytes) A handicap lift has been installed for access to the front stage area.  Wheel chair seating is available at the top and bottom rows of seating.
SCJUN1.jpg (68193 bytes) Due to the deteriorated condition of the steps at the main entrance to Illinois Hall it was necessary to repair and rebuild these steps.  Once the railings are installed this work will also be completed.