SCMAR7.jpg (75409 bytes) These are the temporary stairs leading to the raised level of the stage.
SCMAR2.jpg (65418 bytes) Plywood flooring is being installed to the new steel frame structure.
SCMAR3.jpg (64351 bytes) The ceiling grid and lighting above the stage area is being completed.
SCMAR5.jpg (67388 bytes) Each station will have access to power and  data.  The conduits for this are feed from underneath the new flooring system.
SCMAR6.jpg (68049 bytes) The conduits are brought up through the floor at this location.  From here the power and data will be supplied to each station.
SCMAR8.jpg (70794 bytes) This is a look at the structure under the new flooring system.  You will notice the steel framing rests on the existing concrete steps.
SCMAR9.jpg (65870 bytes) Progress so far on our new auditorium.