SCMAY1.jpg (61723 bytes) The second floor lobby  ceiling and light fixtures are installed.  The wall covering is also being completed.
SCMAY2.jpg (74909 bytes) The first floor lobby wall finishes are being completed.
SCMAY3.jpg (66493 bytes) Completion so far looking down to the front of the room.
SCMAY5.jpg (67044 bytes) The new tables and carpet have been installed.  Each work station will have an electrical and  data outlet  for a laptop computer.