The second floor lobby ceiling and light fixtures are installed. The wall covering is also being completed. |
![]() |
The first floor lobby wall finishes are being completed. |
![]() |
Completion so far looking down to the front of the room. |
![]() |
The new tables and carpet have been installed. Each work station will have an electrical and data outlet for a laptop computer. |