SCNOV1.jpg (64708 bytes) When completed the auditorium will be named Illinois Hall.
SCNOV2.jpg (75413 bytes) Scaffolding is set up and demolition has begun.
SCNOV3.jpg (75171 bytes) All debris is being removed through the door on the south side of the building.   The area around the dumpster has been fenced off for safety reasons.